Night logistics in Antwerp: making better use of the hours we already have


When ports talk about capacity, the conversation usually turns to space: more quay, more lanes, more gates. But at many terminals and depots in the Port of Antwerp-Bruges, the real pressure point is time. From 1 November 2026, six depots will test what happens when the working day becomes a little longer.
Congestion is often a question of timing
Spend a morning at a terminal gate or depot and the pattern is easy to recognise. Trucks arrive in waves, first early in the morning and again in the afternoon. Just before and just after those peaks, the same gate is a lot quieter.
In other words, part of the capacity the port needs already exists. It simply sits in hours that few people use. New infrastructure will always be part of the answer, but it takes years to plan and build. Spreading visits more evenly over the day can start making a difference sooner.
Why the first and last hour matter
Night logistics can sound like asking drivers and teams to work through the night. That is not what this pilot is about.
The pilot focuses on two hours: from 05:00 to 06:00 and from 20:00 to 21:00. Many terminals in the port are already open at those times. By extending their hours, the participating depots bring their own opening hours closer to those of the terminals, so more of the chain is open at the same time. Input from VOKA also shows that early morning and early evening are the most used off-peak hours. An earlier start or a later finish fits into an existing working day, which keeps it realistic for drivers, planners and depot teams alike.
Six depots are taking part
Six depots in the Port of Antwerp-Bruges are taking part: ACC NV, ATO, CCIS BE, DR Depots, Eucore and MedRepair. Each has extended its opening hours to be more in line with the terminals, with some opening earlier, some closing later and some doing both.
Opening longer asks a real effort from depot teams. With the support of Slim naar Antwerpen, both the participating depots and the transport companies receive an incentive for visits in the first and last hour of the extended day. We are grateful to the depots and to Slim naar Antwerpen for making this pilot possible.
No single party can do this alone
Congestion is a shared challenge, and it rarely has one owner. A depot can open its gate earlier, but that only helps when terminals, transport companies and shipping lines can plan around it.
A pilot like this starts with questions rather than answers. Which hours will actually be used? How does planning change when depots open earlier or close later? And what would be needed to make longer opening hours work beyond the pilot?
We don't know the answers yet, but we are curious to find out. As cargo volumes continue to grow, making good use of the infrastructure that is already there is likely to matter more and more, for everyone in the port. This pilot is one small, practical step in that direction.